Construction cost-overrun equity test
Calculate additional cash needed after a budget change. Includes cost contingency and available-debt reconciliation.
Your assumptions
Illustrative starting values. Replace them with your own evidence. Inputs stay in this browser.
Your scenario, explained
Results
Calculation assumptions
Version 1.0.0 · Educational scenario, subject to the stated assumptions.
How this calculation works
Method and assumptions
Stress forecast remaining costs, add delay costs and incurred costs for total forecast. Compare with base budget plus contingency. Separately compare remaining cash needs with undrawn committed debt plus available sponsor cash.
Worked example
The default $3.2 million remaining cost forecast rises 10% to $3.52 million; $100,000 delay costs make $3.62 million needed to finish. Adding $3 million incurred costs gives $6.62 million total, $320,000 over the $6 million base budget plus $300,000 contingency. With $2 million undrawn debt and $1 million sponsor cash, additional equity is $620,000. The contingency allowance is not another cash source.
Before using the result
Know the boundaries
- Educational scenario, not a quote, commitment, approval, appraisal or payoff statement.
- Defaults and thresholds are editable illustrations; the executed documents and lender underwriting control.
- Contingency is a budget allowance, not an additional cash source. Undrawn commitment is assumed drawable; lender conditions may restrict access.
Method references
Discuss your financing with Jaken Finance Group ↗Keep working through the decision
Related resources
Delayed stabilization and additional borrower cash
Determine the funding needed when operating improvement arrives late. Includes timing-shift cash deficit and interest schedule.
Construction draw inspections and payment timing
Plan cash needed between contractor requests and lender funding. Includes request inspection approval and funding timeline.
Change orders and construction loan availability
Determine whether changed scope is funded or requires new equity. Includes change-order funding and approval ledger.