capital construction and servicing workspaces · Advanced
Construction draw and interest-reserve model
Calculate drawn principal interest and reserve use through construction. Includes explicit draw-timing and capitalized-interest ledger.
Your assumptions
Illustrative starting values. Replace them with your own evidence. Inputs stay in this browser.
Your scenario, explained
Results
Calculation assumptions
Version 1.0.0 · Educational scenario, subject to the stated assumptions.
How this calculation works
Method and assumptions
For each actual calendar month, apply the selected day count to opening balance plus the timing-weighted draw. Capitalized interest increases the next month’s opening balance. Compare modeled total interest and peak balance with reserve and commitment.
Worked example
The default beginning-of-month draws for January–June 2027 are $300,000, $500,000, $700,000, $650,000, $500,000 and $250,000. At 8% Actual/360 with month-end interest capitalization and no opening balance, the $2.9 million draws generate $70,033.18 interest and a $2,970,033.18 ending balance. The entered $150,000 reserve exceeds modeled interest by $79,966.82. Actual daily draws or a delayed completion would change the result.
Before using the result
Know the boundaries
- Educational scenario, not a quote, commitment, approval, appraisal or payoff statement.
- Defaults and thresholds are editable illustrations; the executed documents and lender underwriting control.
- Monthly draws approximate daily disbursements; midpoint timing is an approximation. The reserve is a funding comparison, not extra capacity beyond the commitment. Interest capitalizes at month-end without within-month compounding.
Method references
Discuss your financing with Jaken Finance Group ↗Keep working through the decision
Related resources
Construction commitment, funded balance and interest
Model construction interest from the draw schedule and distinguish committed principal, financed fees and sponsor-paid carrying costs.
Reserves and holdbacks funding bridge
Calculate cash usable at closing and later funded stages. Includes committed-to-funded proceeds waterfall with separate restricted funds.
A financing sources-and-uses schedule that balances by phase
Build an editable financing budget that reconciles deposits, closing funds, future advances and sponsor equity without counting the same dollar twice.